Russian projects

Foreign projects

Cutting-edge technologies used at Novoporotovskoe field

Novy Port Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

188.9

(116.6 + 72.3)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

2.96

(2.9 and 51)

Start of commercial production → attainment of projected capacity

2016 → 2021

Projected capacity, mn t of oil per year

8.0

Stake of Gazprom Neft

90 %
Milestones of 2016:
  • launch of infrastructure to ensure annual oil exports of up to 5.5 mn TOE by sea;
  • successful implementation of a technological plan to drill complex wells and conduct hydraulic fracturing, and the drilling of the longest horizontal wellbore (2,000 m) of all wells previously drilled at the subsidiary.
Plans for 2017:
  • complete construction on a compressor station with a complex gas treatment unit, inject gas into the reservoir and make a decision on the monetisation of the gas;
  • determine the technical feasibility of the option of monetising condensate and conducting marketing research;
  • build and launch a gas-turbine thermal power plant.
Messoyakha

Messoyakha Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

71.8
(10.9 + 60.9)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

0.36
(0.36 and 0)

Start of commercial production → attainment of projected capacity

2016 → 2022
2022 → 2025

Projected capacity, mn t of oil per year

7.1

Stake of Gazprom Neft

50 %
Milestones of 2016:
  • start of the commercial development of the East Messoyakha license area and start of oil delivery to the Transneft PJSC pipeline system (September);
  • coordination of technical and technological solutions for gas injection projects, and start of design and survey work;
  • customs duty exemption obtained.
Plans for 2017:
  • design and ordering of equipment for a compressor station with a gas treatment unit;
  • drilling under abnormally high reservoir pressure;
  • construction of wells using Fishbone technology with wellbore casing.
Documentary “Cold rush. drilling for oil amid arctic ice” (Russia today)

Prirazlomnoye

PRMS hydrocarbon reserves (proven + probable), mn TOE

58.0
(25.9 + 32.1)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

2.19
(2.15 and 45)

Start of commercial production → attainment of projected capacity

2014 → 2023

Projected capacity, mn t of oil per year

4.8

Stake of Gazprom Neft

100 %
Milestones of 2016:
  • 3 millionth tonne of ARCO oil produced;
  • 32 oil tankers shipped;
  • shift camp put into operation;
  • modernisation of an offshore ice-resistant fixed platform (OIRFP).
Plans for 2017:
  • complete a programme to build four horizontal wells;
  • transition to the use of hydrocarbon-based solutions when drilling wells;
  • implementation of a sootless APG flaring project;
  • implementation of a pilot testing plan and field performance of spare parts, tools and accessories for the OIRFP as part of an import substitution programme.
Kuyumba

Kuyumba Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

123.3

(9.6 + 113.7)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

0.04

(0.04 and 0)

Start of commercial production → attainment of projected capacity

2018 → 2032

Projected capacity, mn t of oil per year

5.45

Stake of Gazprom Neft

50 %
Milestones of 2016:
  • design and survey work completed for the main ‘Early Oil’ on-site facilities;
  • construction and installation work completed for the ‘Early Oil’ facilities.
Plans for 2017:
  • start of oil delivery to the Transneft PJSC pipeline system;
  • obtain an export duty exemption;
  • well testing under the ‘Early Oil’ programme;
  • construction of a central gathering facility (CGF) and crude oil delivery and acceptance point (CODAP) with first phase capacity of 1.3 mn t.
Chonsky

Chonsky

PRMS hydrocarbon reserves (proven + probable), mn TOE

78.0
(13.9 + 64.1)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

0.03
(0.03 and 0)

Start of commercial production → attainment of projected capacity

2024 → 2024

Projected capacity, mn t of oil per year

n/a

Stake of Gazprom Neft

100 %
Milestones of 2016:
  • well workover performed with hydraulic fracturing at one well on terrigenous reservoirs;
  • transition to day rate, contracting of services and drilling of a well under day rate conditions;
  • 1,200-m horizontal sidetrack well drilled at the Ignyalinsky license area without accidents or complications with an on-the-fly adjustment of the borehole trajectory;
  • successful hydraulic fracturing was performed at the Ignyalinsky license area with a five-fold increase in the oil flow rate.
Plans for 2017:
  • confirmation of the effectiveness of hydraulic fracturing based on well workover with hydraulic fracturing at two existing wells in terrigenous reservoirs;
  • multi-stage hydraulic fracturing at the project's first horizontal well;
  • drilling of a second horizontal well with two pilot holes;
  • completion of field data analysis on the interpretation of seismic data at the Bolshaya Medveditsa site.
Severenergy

SeverEnergy Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

503.5

(324.9 + 178.6)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

13.48
(0.115 and 12,089 and 3.653)

Start of commercial production → attainment of projected capacity

2012 → 2016

Projected capacity, mn t of oil per year

14.84

Stake of Gazprom Neft

46.67 %
Milestones of 2016:
  • start of commercial operation of the UPM-50 methanol production and regeneration unit at the Urengoyskoye oil and gas condensate field (OGCF);
  • design documentation for the oil infrastructure of Yaro-Yakha transferred to the State Expert Evaluation Department.
Plans for 2017:
  • completion of the design and start of construction and installation work on the oil component of the Yaro-Yakha OGCF;
  • launch of the booster compressor station at the Samburgskoye OGCF.
Northgas

Northgas Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

221.8

(180.3 + 41.5)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

4.59
(0 and 5,064 and 0.519)

Start of commercial production → attainment of projected capacity

2001 → 2015

Projected capacity, mn t of oil per year

4.95

Stake of Gazprom Neft

50 %
Milestones of 2016:
  • start of commercial operation of the UPM-50 methanol production and regeneration unit at the Urengoyskoye oil and gas condensate field (OGCF);
  • design documentation for the oil infrastructure of Yaro-Yakha transferred to the State Expert Evaluation Department.
Plans for 2017:
  • completion of the design and start of construction and installation work on the oil component of the Yaro-Yakha OGCF;
  • launch of the booster compressor station at the Samburgskoye OGCF.
Dolginskoye

Dolginskoye

PRMS hydrocarbon reserves (proven + probable), mn TOE

No estimate conducted

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

– (–)

Start of commercial production → attainment of projected capacity

2027 → n/a

Projected capacity, mn t of oil per year

n/a

Stake of Gazprom Neft

100 %
Milestones of 2016:
  • preparatory measures for 3D seismic survey.
Plans for 2017:
  • 3D seismic survey;
  • search for a partner to jointly implement the project.
Badra

Badra Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

22.4
(10.5+11.9)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

0.78
(0.78 and 4.2)

Start of commercial production → attainment of projected capacity

2014 → 2019

Projected capacity, mn t of oil per year

1.71

Stake of Gazprom Neft

30 %
Milestones of 2016:
  • 3 millionth tonne of oil produced;
  • 5 oil tankers shipped;
  • drilling completed and 5 wells put into operation;
  • launch of priority infrastructure facilities for a central gathering facility, camp and the third oil treatment processing line.
Plans for 2017:
  • launch of a gas plant and export gas pipeline;
  • adjustments to the final development plan and adoption of a decision on the drilling of additional wells.
Kurdistan

Kurdistan Data given taking into account Gazprom Neft’s stake in the project.

PRMS hydrocarbon reserves (proven + probable), mn TOE

0.8
(0 + 0.8)

Hydrocarbon production in 2016 (oil, mn t and gasGas production consists of total commercial gas and gas used for internal needs., mn m3, DECGas condensate in the projects of SeverEnergy and Northgas.)

0.09
(0.09 and 0)

Start of commercial production → attainment of projected capacity

2015 → 2020

Projected capacity, mn t of oil per year

1.2

Stake of Gazprom Neft

40% - Garmian 80% - Shakal 80% - Halabja
Milestones of 2016:
  • operating functions for the Sarkala field transferred to Gazprom Neft from WZL;
  • piping and instrumentation diagram for the Sarkala field endorsed by the Ministry of Natural Resources of the Kurdish Autonomous Region;
  • 3D interpretation of seismic works completed at the northwest Shakal block based on which the geological model was updated and the resource base was reassessed;
  • standard 2D interpretation of seismic work completed at the Halabja block and the conceptual geological model of the block was updated.
Plans for 2017:
  • well workover of Shakal-1 (hydraulic fracturing of Lower Jaddala);
  • drilling of a well and preparatory work to expand the oil treatment unit at the Sarkala field.